Skip to content
Home > CAD & Revit - Light Frame > 3-Hour Fire Wall at Truss Floor with WSP

3-Hour Fire Wall at Truss Floor with WSP

Intersection detail showing top chord bearing floor trusses to wood stud walls on either side of a 3-hour metal stud fire wall. Fire retardant-treated floor sheathing runs through the 3-hour wall.

3-Hour Fire Wall at Truss Floor with WSP

Intersection detail showing top chord bearing floor trusses to wood stud walls on either side of a 3-hour metal stud fire wall. Fire retardant-treated floor sheathing runs through the 3-hour wall.
AW19-3HourFireWallAtTrussFloorWithWSP

Fill out the form below to begin your download.

"*" indicates required fields

Name*
Address*

By submitting this form, you agree to our terms & privacy policy.